{"id":6487,"date":"2024-12-16T23:19:16","date_gmt":"2024-12-16T23:19:16","guid":{"rendered":"https:\/\/aceroestudio.com\/?p=6487"},"modified":"2024-12-16T23:19:16","modified_gmt":"2024-12-16T23:19:16","slug":"what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects","status":"publish","type":"post","link":"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/","title":{"rendered":"What Types of Clashes Does the BIM Methodology Prevent in Construction Projects?"},"content":{"rendered":"<p>As we have illustrated on several occasions, the BIM methodology is essential in preventing conflicts in construction projects. These conflicts are often referred to as clashes, as they involve collisions or inconsistencies that, thanks to BIM, can be avoided due to the logic embedded in its software.<\/p>\n<h3><strong>Physical Clashes<\/strong><\/h3>\n<p>These occur when two or more elements of a project occupy the same physical space. In traditional construction, design tools are not updated in real time or are often not incorporated into the main plans, leading to issues during execution.<\/p>\n<p>These are serious problems that can affect structures, such as:<\/p>\n<ul>\n<li>A pipe running through a structural beam<\/li>\n<li>Water or ventilation ducts colliding with electrical installations<\/li>\n<li>Mechanical equipment lacking sufficient space for maintenance or installation<\/li>\n<\/ul>\n<p>BIM identifies these interferences through &#8220;clash detection&#8221; analysis, allowing for appropriate corrections in the model before the issue results in a poorly executed construction.<\/p>\n<h3><strong>Functional Clashes<\/strong><\/h3>\n<p>These involve incompatibilities in the performance or operation of systems, including electrical, plumbing, and HVAC systems. Examples of functional clashes include:<\/p>\n<ul>\n<li>Inadequate ventilation in a space due to poor placement of HVAC systems<\/li>\n<li>Electrical systems designed for loads higher or lower than required<\/li>\n<li>Hydraulic connections incompatible with equipment specifications<\/li>\n<\/ul>\n<h3><strong>Design Issues<\/strong><\/h3>\n<p>These relate to aesthetics, accessibility, or regulatory compliance. In every construction project, installations must adhere to regulations and good design practices that ensure proper ventilation, lighting, and pedestrian circulation.<\/p>\n<p>By using pre-developed BIM models, we ensure compliance with all parameters of the original design and can identify the proper placement of installations in time to achieve an optimal building design.<\/p>\n<p><img decoding=\"async\" class=\"wp-image-6480 size-thumbnail\" src=\"https:\/\/aceroestudio.com\/wp-content\/uploads\/2024\/12\/arquitectura-150x150.png\" alt=\"dise\u00f1o arquitectonico\" width=\"150\" height=\"150\" srcset=\"https:\/\/aceroestudio.com\/wp-content\/uploads\/2024\/12\/arquitectura-150x150.png 150w, https:\/\/aceroestudio.com\/wp-content\/uploads\/2024\/12\/arquitectura-300x300.png 300w, https:\/\/aceroestudio.com\/wp-content\/uploads\/2024\/12\/arquitectura.png 512w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/p>\n<h3><strong>Planning and Scheduling Errors<\/strong><\/h3>\n<p>Thanks to 4D simulation tools, BIM incorporates the dimension of time, helping to avoid scheduling problems such as:<\/p>\n<ul>\n<li>Equipment installation being scheduled before the space is built<\/li>\n<li>Overlapping activities that cause delays or additional costs<\/li>\n<\/ul>\n<p>As you can see, the benefits of BIM in construction enable effective project management, planning, and execution with accurate and up-to-date information.<\/p>\n<p><img decoding=\"async\" class=\"wp-image-6484 size-thumbnail alignleft\" src=\"https:\/\/aceroestudio.com\/wp-content\/uploads\/2024\/12\/tiempo-150x150.png\" alt=\"planificacion bim\" width=\"150\" height=\"150\" srcset=\"https:\/\/aceroestudio.com\/wp-content\/uploads\/2024\/12\/tiempo-150x150.png 150w, https:\/\/aceroestudio.com\/wp-content\/uploads\/2024\/12\/tiempo-300x300.png 300w, https:\/\/aceroestudio.com\/wp-content\/uploads\/2024\/12\/tiempo.png 512w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>If you want to implement this important methodology in your projects, it\u2019s crucial to have proper training. Our <strong><a href=\"https:\/\/aceroestudio.com\/en\/bim-consulting-services\/\">BIM consultancy<\/a><\/strong> ensures the safe implementation of BIM at any stage of development. Reduce risks, rework, and costs with <a href=\"https:\/\/aceroestudio.com\/en\/\"><strong>Acero Estudio<\/strong><\/a>, a company specialized in BIM in Spain and Peru.<\/p>\n<p><strong><a href=\"https:\/\/aceroestudio.com\/en\/contact\/\">Contact us<\/a> today and let\u2019s enhance your BIM models together!<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>As we have illustrated on several occasions, the BIM methodology is essential in preventing conflicts in construction projects. These conflicts are often referred to as clashes, as they involve collisions or inconsistencies that, thanks to BIM, can be avoided due to the logic embedded in its software. Physical Clashes These occur when two or more elements of a project occupy the same physical space. In traditional construction, design tools are not updated in real time or are often not incorporated into the main plans, leading to issues during execution. These are serious problems that can affect structures, such as: A pipe running through a structural beam Water or ventilation ducts colliding with electrical installations Mechanical equipment lacking sufficient space for maintenance or installation BIM identifies these interferences through &#8220;clash detection&#8221; analysis, allowing for appropriate corrections in the model before the issue results in a poorly executed construction. Functional Clashes These involve incompatibilities in the performance or operation of systems, including electrical, plumbing, and HVAC systems. Examples of functional clashes include: Inadequate ventilation in a space due to poor placement of HVAC systems Electrical systems designed for loads higher or lower than required Hydraulic connections incompatible with equipment specifications Design Issues These relate to aesthetics, accessibility, or regulatory compliance. In every construction project, installations must adhere to regulations and good design practices that ensure proper ventilation, lighting, and pedestrian circulation. By using pre-developed BIM models, we ensure compliance with all parameters of the original design and can identify the proper placement of installations in time to achieve an optimal building design. Planning and Scheduling Errors Thanks to 4D simulation tools, BIM incorporates the dimension of time, helping to avoid scheduling problems such as: Equipment installation being scheduled before the space is built Overlapping activities that cause delays or additional costs As you can see, the benefits of BIM in construction enable effective project management, planning, and execution with accurate and up-to-date information. &nbsp; &nbsp; &nbsp; &nbsp; If you want to implement this important methodology in your projects, it\u2019s crucial to have proper training. Our BIM consultancy ensures the safe implementation of BIM at any stage of development. Reduce risks, rework, and costs with Acero Estudio, a company specialized in BIM in Spain and Peru. Contact us today and let\u2019s enhance your BIM models together!<\/p>\n","protected":false},"author":7,"featured_media":6482,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_joinchat":[],"footnotes":""},"categories":[12,57],"tags":[],"class_list":["post-6487","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-articles-en","category-bim-consulting"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>What Types of Clashes Does the BIM Methodology Prevent in Construction Projects?<\/title>\n<meta name=\"description\" content=\"The BIM methodology is essential in preventing conflicts in construction projects. These conflicts are often referred to as clashes.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What Types of Clashes Does the BIM Methodology Prevent in Construction Projects?\" \/>\n<meta property=\"og:description\" content=\"The BIM methodology is essential in preventing conflicts in construction projects. These conflicts are often referred to as clashes.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/\" \/>\n<meta property=\"og:site_name\" content=\"Acero Estudio\" \/>\n<meta property=\"article:published_time\" content=\"2024-12-16T23:19:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/aceroestudio.com\/wp-content\/uploads\/2024\/12\/que-colisiones-evita-bim.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"640\" \/>\n\t<meta property=\"og:image:height\" content=\"427\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin-paco\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin-paco\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/\"},\"author\":{\"name\":\"admin-paco\",\"@id\":\"https:\/\/aceroestudio.com\/#\/schema\/person\/f621919620f6ffed87838419bb894380\"},\"headline\":\"What Types of Clashes Does the BIM Methodology Prevent in Construction Projects?\",\"datePublished\":\"2024-12-16T23:19:16+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/\"},\"wordCount\":397,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/aceroestudio.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/aceroestudio.com\/wp-content\/uploads\/2024\/12\/que-colisiones-evita-bim.jpg\",\"articleSection\":[\"Articles\",\"BIM Consulting\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/\",\"url\":\"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/\",\"name\":\"What Types of Clashes Does the BIM Methodology Prevent in Construction Projects?\",\"isPartOf\":{\"@id\":\"https:\/\/aceroestudio.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/aceroestudio.com\/wp-content\/uploads\/2024\/12\/que-colisiones-evita-bim.jpg\",\"datePublished\":\"2024-12-16T23:19:16+00:00\",\"description\":\"The BIM methodology is essential in preventing conflicts in construction projects. These conflicts are often referred to as clashes.\",\"breadcrumb\":{\"@id\":\"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/#primaryimage\",\"url\":\"https:\/\/aceroestudio.com\/wp-content\/uploads\/2024\/12\/que-colisiones-evita-bim.jpg\",\"contentUrl\":\"https:\/\/aceroestudio.com\/wp-content\/uploads\/2024\/12\/que-colisiones-evita-bim.jpg\",\"width\":640,\"height\":427,\"caption\":\"que colisiones evita bim\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/aceroestudio.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What Types of Clashes Does the BIM Methodology Prevent in Construction Projects?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/aceroestudio.com\/#website\",\"url\":\"https:\/\/aceroestudio.com\/\",\"name\":\"Acero Estudio\",\"description\":\"Laser Scanning, BIM, CAD, Topograf\u00eda, Dron y Gemelo Digital.\",\"publisher\":{\"@id\":\"https:\/\/aceroestudio.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/aceroestudio.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/aceroestudio.com\/#organization\",\"name\":\"ACERO ESTUDIO\",\"url\":\"https:\/\/aceroestudio.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/aceroestudio.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/aceroestudio.com\/wp-content\/uploads\/2020\/08\/ACERO-V1.png\",\"contentUrl\":\"https:\/\/aceroestudio.com\/wp-content\/uploads\/2020\/08\/ACERO-V1.png\",\"width\":736,\"height\":238,\"caption\":\"ACERO ESTUDIO\"},\"image\":{\"@id\":\"https:\/\/aceroestudio.com\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/aceroestudio.com\/#\/schema\/person\/f621919620f6ffed87838419bb894380\",\"name\":\"admin-paco\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/aceroestudio.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/ad8eeaf87dccde01c4a8554aa568148b8dc487e2b3ea99709e8b9b140d08fd68?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/ad8eeaf87dccde01c4a8554aa568148b8dc487e2b3ea99709e8b9b140d08fd68?s=96&d=mm&r=g\",\"caption\":\"admin-paco\"},\"url\":\"https:\/\/aceroestudio.com\/en\/author\/admin-paco\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What Types of Clashes Does the BIM Methodology Prevent in Construction Projects?","description":"The BIM methodology is essential in preventing conflicts in construction projects. These conflicts are often referred to as clashes.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/","og_locale":"en_US","og_type":"article","og_title":"What Types of Clashes Does the BIM Methodology Prevent in Construction Projects?","og_description":"The BIM methodology is essential in preventing conflicts in construction projects. These conflicts are often referred to as clashes.","og_url":"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/","og_site_name":"Acero Estudio","article_published_time":"2024-12-16T23:19:16+00:00","og_image":[{"width":640,"height":427,"url":"https:\/\/aceroestudio.com\/wp-content\/uploads\/2024\/12\/que-colisiones-evita-bim.jpg","type":"image\/jpeg"}],"author":"admin-paco","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin-paco","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/#article","isPartOf":{"@id":"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/"},"author":{"name":"admin-paco","@id":"https:\/\/aceroestudio.com\/#\/schema\/person\/f621919620f6ffed87838419bb894380"},"headline":"What Types of Clashes Does the BIM Methodology Prevent in Construction Projects?","datePublished":"2024-12-16T23:19:16+00:00","mainEntityOfPage":{"@id":"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/"},"wordCount":397,"commentCount":0,"publisher":{"@id":"https:\/\/aceroestudio.com\/#organization"},"image":{"@id":"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/#primaryimage"},"thumbnailUrl":"https:\/\/aceroestudio.com\/wp-content\/uploads\/2024\/12\/que-colisiones-evita-bim.jpg","articleSection":["Articles","BIM Consulting"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/","url":"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/","name":"What Types of Clashes Does the BIM Methodology Prevent in Construction Projects?","isPartOf":{"@id":"https:\/\/aceroestudio.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/#primaryimage"},"image":{"@id":"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/#primaryimage"},"thumbnailUrl":"https:\/\/aceroestudio.com\/wp-content\/uploads\/2024\/12\/que-colisiones-evita-bim.jpg","datePublished":"2024-12-16T23:19:16+00:00","description":"The BIM methodology is essential in preventing conflicts in construction projects. These conflicts are often referred to as clashes.","breadcrumb":{"@id":"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/#primaryimage","url":"https:\/\/aceroestudio.com\/wp-content\/uploads\/2024\/12\/que-colisiones-evita-bim.jpg","contentUrl":"https:\/\/aceroestudio.com\/wp-content\/uploads\/2024\/12\/que-colisiones-evita-bim.jpg","width":640,"height":427,"caption":"que colisiones evita bim"},{"@type":"BreadcrumbList","@id":"https:\/\/aceroestudio.com\/en\/what-types-of-clashes-does-the-bim-methodology-prevent-in-construction-projects\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/aceroestudio.com\/"},{"@type":"ListItem","position":2,"name":"What Types of Clashes Does the BIM Methodology Prevent in Construction Projects?"}]},{"@type":"WebSite","@id":"https:\/\/aceroestudio.com\/#website","url":"https:\/\/aceroestudio.com\/","name":"Acero Estudio","description":"Laser Scanning, BIM, CAD, Topograf\u00eda, Dron y Gemelo Digital.","publisher":{"@id":"https:\/\/aceroestudio.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/aceroestudio.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/aceroestudio.com\/#organization","name":"ACERO ESTUDIO","url":"https:\/\/aceroestudio.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/aceroestudio.com\/#\/schema\/logo\/image\/","url":"https:\/\/aceroestudio.com\/wp-content\/uploads\/2020\/08\/ACERO-V1.png","contentUrl":"https:\/\/aceroestudio.com\/wp-content\/uploads\/2020\/08\/ACERO-V1.png","width":736,"height":238,"caption":"ACERO ESTUDIO"},"image":{"@id":"https:\/\/aceroestudio.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/aceroestudio.com\/#\/schema\/person\/f621919620f6ffed87838419bb894380","name":"admin-paco","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/aceroestudio.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/ad8eeaf87dccde01c4a8554aa568148b8dc487e2b3ea99709e8b9b140d08fd68?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ad8eeaf87dccde01c4a8554aa568148b8dc487e2b3ea99709e8b9b140d08fd68?s=96&d=mm&r=g","caption":"admin-paco"},"url":"https:\/\/aceroestudio.com\/en\/author\/admin-paco\/"}]}},"_links":{"self":[{"href":"https:\/\/aceroestudio.com\/en\/wp-json\/wp\/v2\/posts\/6487","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aceroestudio.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aceroestudio.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aceroestudio.com\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/aceroestudio.com\/en\/wp-json\/wp\/v2\/comments?post=6487"}],"version-history":[{"count":1,"href":"https:\/\/aceroestudio.com\/en\/wp-json\/wp\/v2\/posts\/6487\/revisions"}],"predecessor-version":[{"id":6488,"href":"https:\/\/aceroestudio.com\/en\/wp-json\/wp\/v2\/posts\/6487\/revisions\/6488"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aceroestudio.com\/en\/wp-json\/wp\/v2\/media\/6482"}],"wp:attachment":[{"href":"https:\/\/aceroestudio.com\/en\/wp-json\/wp\/v2\/media?parent=6487"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aceroestudio.com\/en\/wp-json\/wp\/v2\/categories?post=6487"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aceroestudio.com\/en\/wp-json\/wp\/v2\/tags?post=6487"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}